OC Public Works contractors have completed the bridge rehabilitation. The rehabilitation work consisted of repairing the stairway, and existing electrical, replacing the fence and anchor bolts, patching deteriorated concrete, installing cathodic protection and applying new paint to extend the service life of the bridge until its scheduled replacement in 2021.

About The Author Dana Point Times

comments (0)

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>